Turns out that the crew wasn't aboard during the wet-dress rehearsal. They remain back in Houston. But the rest of the fueling and countdown was conducted as if it was the real thing.

An early problem was a hydrogen leak around a fueling connection. Hydrogen leaks are hard to prevent since hydrogen H2 molecules are tiny little sneaky devils that are always trying to escape, so some leakage was expected. Test conductors decided that the leak was small enough that they could proceed with the test.

Other relatively minor problems developed, most notably problems closing an access hatch. Ground closeout crews struggled with that one, causing a hold, but eventually got it sorted out.

But as the countdown approached t-5 minutes, the hydrogen leak had grown to the point where it was starting to become dangerous, so the launch rehearsal was scrubbed.

Update

Jared just posted this:

https://x.com/NASAAdmin/status/2018578937115271660

"With the conclusion of the wet dress rehearsal today, we are moving off the February launch window and targeting March for the earliest possible launch of Artemis II.

With more than three years between SLS launches, we fully anticipated encountering challenges. That is precisely why we conduct a wet dress rehearsal. These tests are designed to surface issues before flight and set up launch day with the highest probability of success.

During the test, teams worked through a liquid hydrogen leak at a core stage interface during tanking, which required pauses to warm hardware and adjust propellant flow. All core stage and interim cryogenic propulsion stage tanks were successfully filled, and teams conducted a terminal countdown to about T-5 minutes before the ground launch sequencer halted operations due to an increased leak rate. Additional factors included extended Orion closeout work, intermittent ground audio dropouts, and cold-weather impacts to some cameras, along with the successful demonstration of updated Orion closeout purge procedures to support safe crew operations.

As always, safety remains our top priority, for our astronauts, our workforce, our systems, and the public. As noted above, we will only launch when we believe we are as ready to undertake this historic mission..."
Reply
#73
Yazata Offline
After the second Artemis II wet dress rehearsal apparently went exceedingly well, they were shooting for an Artemis II launch on March 6.

Then Jared posted this...

https://x.com/NASAAdmin/status/2025231621436186837

"After overnight data showed an interruption in helium flow in the SLS interim cryogenic propulsion stage, teams are troubleshooting and preparing for a likely rollback of Artemis II to the VAB at NASAKennedy. This will almost assuredly impact the March launch window. NASA will continue to provide updates as they become available."

And he quickly followed up with this...

https://x.com/NASAAdmin/status/2025249086908125630

"As an update to my earlier post.

- The ICPS helium bottles are used to purge the engines, as well as for LH2 and LOX tank pressurization. The systems did work correctly during WDR1 and WDR2.

- Last evening, the team was unable to get helium flow through the vehicle. This occurred during a routine operation to repressurize the system.

- We observed a similar failure signature on Artemis I.

- The Artemis II vehicle is in a safe configuration, using ground ECS purge for the engines versus the onboard helium supply.

- Potential faults could include the final filter between the ground and flight vehicle, located on the umbilical, though this seems least likely based on the failure signature. It could also be a failed QD umbilical interface, where similar issues have been observed. It could also be a failed check valve onboard the vehicle, which would be consistent with Artemis I, though corrective actions were taken to minimize reoccurrence on Artemis II.

Regardless of the potential fault, accessing and remediating any of these issues can only be performed in the VAB.

As mentioned previously, we will begin preparations for rollback, and this will take the March launch window out of consideration.

I understand people are disappointed by this development. That disappointment is felt most by the team at NASA, who have been working tirelessly to prepare for this great endeavor. During the 1960s, when NASA achieved what most thought was impossible, and what has never been repeated since, there were many setbacks. One historic example is that Neil Armstrong spent less than 11 hours in space on Gemini 8 before his mission ended prematurely due to a technical issue. A little over three years later, he became the first man to walk on the Moon.

There are many differences between the 1960s and today, and expectations should rightfully be high after the time and expense invested in this program. I will say again, the President created Artemis as a program that will far surpass what America achieved during Apollo. We will return in the years ahead, we will build a Moon base, and undertake what should be continuous missions to and from the lunar environment. Where we begin with this architecture and flight rate is not where it will end.

Please expect a more extensive briefing later this week as we outline the path forward, not just for Artemis II, but for subsequent missions, to ensure NASA meets the President’s vision to return to the Moon and, this time, to stay."
Reply
Reply
#75
Yazata Offline
Jared just announced a major overhaul to the Artemis Moon program.

https://www.nasa.gov/news-release/nasa-a...hitecture/

Quote:As teams prepare to launch Artemis II in the weeks ahead, the Artemis III mission, now in 2027, will be designed to test out systems and operational capabilities in low Earth orbit to prepare for an Artemis IV landing in 2028. This new mission will endeavor to include a rendezvous and docking with one or both commercial landers from SpaceX and Blue Origin, in-space tests of the docked vehicles, integrated checkout of life support, communications, and propulsion systems, as well as tests of the new Extravehicular Activity (xEVA) suits. NASA will further define this test flight after completing detailed reviews between NASA and our industry partners. The agency will share the specific objectives for the updated Artemis III mission in the near future.

So Artemis IV will be the lunar landing, not Artemis III.

In addition to adding an additional Artemis test mission in 2027 to test docking with either the SpaceX or Blue Origin lander, depending on which one is further along a year from now, they plan changes in the SLS architecture as well. Currently they are developing a more powerful upper stage for SLS, and now it sounds like it will either be cancelled or deemphasized.

Quote:“NASA must standardize its approach, increase flight rate safely, and execute on the President’s national space policy. With credible competition from our greatest geopolitical adversary increasing by the day, we need to move faster, eliminate delays, and achieve our objectives,” said NASA Administrator Jared Isaacman. “Standardizing vehicle configuration, increasing flight rate and progressing through objectives in a logical, phased approach, is how we achieved the near-impossible in 1969 and it is how we will do it again.”

“After successful completion of the Artemis I flight test, the upcoming Artemis II flight test, and the new, more robust test approach to Artemis III, it is needlessly complicated to alter the configuration of the SLS and Orion stack to undertake subsequent Artemis missions,” said NASA Associate Administrator Amit Kshatriya. “There is too much learning left on the table and too much development and production risk in front of us. Instead, we want to keep testing like we fly and have flown. We are looking back to the wisdom of the folks that designed Apollo. The entire sequence of Artemis flights needs to represent a step-by-step build-up of capability, with each step bringing us closer to our ability to perform the landing missions. Each step needs to be big enough to make progress, but not so big that we take unnecessary risk given previous learnings. Therefore, we want to fly the landing missions in as close to the same Earth ascent configuration as possible – this means using an upper stage and pad systems in as close to the ‘Block 1’ configuration as possible. We will work with our partners that have been developing the evolved block configuration of these systems to take proper actions to align their efforts towards this goal and announce the details of those changes once they are finalized. We will take a similar approach to in-space, landing, and surface EVA operations as well, as we evolve the mission sequence in the spirit of the Apollo mindset, which was obsessed with system reliability and crew safety as the keys to mission success.”
Reply
#76
Yazata Offline
Jared says that the United States Will Begin Building A Lunar Moon Base in 2027, even before the Artemis IV human landing.

"We are going to start immediately…we can do this with uncrewed robotic vehicles and landers and we are going to start in 2027. And I think the public is going to be able to tune in and almost watch us build this space in real time as we start landing on the moon."

NASA has been helping fund a number of lunar landers from Firefly (whose lander has already succeeded) and a variety of other "new space" companies, designed to deliver scientific instruments and small cargoes to the lunar surface. So it looks like NASA is going to start delivering supplies and equipment that astronauts will need to the lunar surface starting next year.

I would love to see them deliver some Optimus bots (hardened as necessary for lunar conditions) that could climb down off these landers and do useful work on the lunar surface.

https://x.com/C__Herridge/status/2031863990981370038

Jared's saying that the public will be able to tune in and watch (live lunar video links?) suggests that he learned from the Starbase experience. SpaceX has generated far more public excitement worldwide than NASA or Blue, in part because everyone can tune in and watch what's happening at Starbase in real time. People spend hours watching and feel personally invested in it. If people around the world can actually watch NASA build a Moon base, they might feel more personal attachment to it as well.
Reply
#77
Yazata Offline
The internet is alive with rumors today, as yet totally unverified, that NASA might be redesigning the entire Artemis Moon program.

The rumor is that SLS will no longer be delivering astronauts to orbit around the Moon in an Orion capsule, where they will board a lander (HLS or Blue's) to land on the surface and return to lunar orbit where they reboard their Orion for the trip home.

The idea is that astronauts will board SpaceX's HLS in Earth orbit and then ride it to and from the Moon. If there's any truth to this, it seemingly cuts SLS out of the whole deal, and maybe Blue Origin's lander as well.

I'm skeptical, since it's such a huge change, and because cutting SLS and Blue Origin out would generate tremendous political opposition. There's probably also some technical problems with that idea.

But maybe NASA revealed something of their plans for after the first few Artemis landings and how they picture switching to a cheaper and more capable lunar architecture able to actually sustain a permanent lunar base. That's my guess. And maybe journalists misunderstood what they were being told.
Reply
#78
Yazata Offline
Jared says, "NASA is leading the greatest adventure in human history, and it has only just begun.

On Tuesday, we’ll share our plans for the future of NASA across many of our programs.

We’ll see you tomorrow morning for Ignition."

https://x.com/NASAAdmin/status/2036144418852323409

So Jared is announcing an all-day event Tuesday March 24 that he calls Ignition.

It will be a day long series of expert panels, each discussing a NASA focus area.

It begins at 9 AM EDT (6 AM PDT Sad ) on NASA's plans for the Moon. It continues at 1 PM EDT on NASA's uncrewed planetary science plans. And it wraps up with a press conference at 4:45 PM EDT recapping the major announcements made during the day and taking questions from the press.

https://www.nasa.gov/news-release/nasa-t...ce-policy/

It will be livestreamed on https://plus.nasa.gov and on NASA's Youtube channel. Maybe on X too.

Jared says, ""Time to start believing again!"
Reply
#79
Yazata Offline
Summing up Jared's NASA Moon plans, Eric Berger is on the case:

https://arstechnica.com/space/2026/03/na...moon-base/

Quote:WASHINGTON, DC—NASA Administrator Jared Isaacman on Tuesday laid out a sweeping vision for the space agency’s next decade during an event called “Ignition” in which he and other senior leaders set out their exploration plans.

Isaacman and his colleagues shared a number of major announcements, including outlining a nuclear-powered mission to Mars that will release three helicopters there and major changes to commercial space stations. However, most significantly, Isaacman outlined a detailed plan to construct a substantial Moon base over the next decade. He framed it as part of a “great power” challenge, saying that if NASA does not succeed now it will cede the Moon to China.

The base included long-range drones, multiple sources of power, sophisticated communications, permanent habitats, scientific laboratories, local manufacturing, and more. To accomplish this, NASA will work with a broad range of industry partners capable of sending medium-size and large cargoes to the lunar surface. Isaacman also confirmed that NASA will no longer build a Lunar Gateway in orbit around the Moon, but would rather focus all of its energy and resources on the lunar surface...

...Garcia-Galan explained that the lunar base would be established through three phases, using a mix of providers primarily through a scaled up Commercial Lunar Payload Services program. Each of these three phases would cost on the order of $10 billion.

The first of these, running through 2028, is estimated to comprise 21 landings, putting a total of 4 metric tons of payload on the Moon, including the VIPER rover to prospect for lunar resources; four “Moon Fall” drones that can travel up to 50 km and reach areas difficult for humans to access; initial versions of a lunar terrain vehicle capable of surviving up to 150 hours without sunlight; and radioisotope heater units. During this phase NASA will also seek to establish two lunar orbital communications satellite constellations.

As part of phase two, running from 2029 to 2032, NASA will seek to secure a site for a lunar base. This phase is projected to entail 27 landings with a total mass of 60 metric tons. These landed payloads would include larger, pressurized rovers, solar and nuclear power sources for surface activities, towers for communication, and excavator rovers.

The final phase, from 2032 to 2036, will establish habitats for long-term human presence, supporting four astronauts for four-week missions. Over the course of 28 landings, NASA would seek to place 150 metric tons of payload on the surface, including fission power, multiple rovers, an “industrial neighborhood” to support in-situ manufacturing, and the capability to return hundreds of kilograms to Earth, such as scientific experiments, critical hardware, and lunar materials...

NASA graphic


[Image: Rvbuw8uG?format=jpg&name=900x900]
[Image: Rvbuw8uG?format=jpg&name=900x900]

Reply
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Chinese Stuff Yazata 5 1,023 Jul 23, 2026 07:29 PM
Last Post: Yazata
  Vandenberg Stuff Yazata 0 273 Jun 30, 2026 06:15 AM
Last Post: Yazata
  Launch Stuff Yazata 92 19,748 Jun 9, 2026 05:21 AM
Last Post: Yazata
  ISS Stuff Yazata 13 2,936 Jan 15, 2026 11:42 PM
Last Post: Yazata
  McGregor Stuff Yazata 12 2,909 Jan 6, 2026 06:39 AM
Last Post: Yazata
  Japanese Stuff Yazata 2 976 Jun 19, 2025 12:37 AM
Last Post: C C
  European Stuff Yazata 1 1,179 Jun 18, 2025 09:50 PM
Last Post: Yazata
  Chinese Stuff Yazata 11 3,331 Apr 18, 2025 08:25 PM
Last Post: Yazata
  Other Assorted Stuff Yazata 52 11,586 Oct 25, 2024 08:32 PM
Last Post: Yazata
  Artemis Stuff - up Kornee 3 1,170 May 2, 2024 05:54 AM
Last Post: Kornee



Users browsing this thread: 1 Guest(s)